Lane Closures

Lane Closures & Construction Updates
#knowbeforeyougo on the North Tarrant Express project and NTE TEXpress Lanes

The North Tarrant Express project team, which operates and maintains both the general highway lanes and the NTE TEXpress Lanes on I-820 and SH-121/183 *occasionally closes lanes for construction improvements and maintenance projects. Below is a list of scheduled lane closure information and construction activity. Please check back frequently for updates as they happen along the corridor. 

Follow @TEXpressAlerts - the official Twitter page for lane closures & construction updates along the LBJ, NTE and NTE 35W TEXpress Lanes.

If you are interested in seeing current messages posted by TxDOT on the various dynamic message signs located along the corridor, click here. For more information about upcoming lane closures in North Texas, click here.

 

North Tarrant Express (I-820, SH-121/183 & 35W) General Highway Lanes

8/31 9p - 9/1 5a: Full closure of EB frontage road I-820 between Riverside Dr. and Beach St.

8/27 9p - 8/28 5a: 2 left lane closure on EB SH-121 at I-35W

8/25 9p - 8/26 5a: Full closure of EB frontage road I-820 between Holiday Ln. and SH26

8/24 9p - 8/25 5a: Full closure of EB frontage road I-820 between Ruge Snow Dr. and Holiday Ln.

8/22 9p - 8/23 5a: Full closure of WB frontage road I-820 between Beach St. and Riverside Dr.

8/21 9p - 8/22 10a: 2 right lane closures on WB frontage road I-820 located between Riverside Dr. and Beach St.

8/21 9p - 8/22 5a: Full closure of EB frontage road I-820 between Rufe Snow Dr. and Holiday Ln.

8/19 9p - 8/20 5a: Full closure of EB frontage road I-820 including EB Halton Bypass and EB NTE TEXpress Lanes exit to Denton Hwy.

8/18 9p - 8/19 5a: Full closure of EB frontage road I-820 between Riverside Dr. and Beach st.

8/17 9p - 8/18 5a: Full closure of WB frontage road I-820 between Denton Hwy. and Haltom Rd.

8/15 9p - 8/16 10a: Full closure of WB frontage road I-820 between Denton Hwy. and Haltom Rd.

8/12 9p - 8/13 5a: Full closure of EB I-820 between Beach St. to Denton Hwy. 

8/12 9p - 8/13 5a: Full closure of exit ramp from SB I-35W to SB frontage road between I-820 and Meacham Blvd.

8/4 9p - 8/5 5a: 1 left lane closure on SB I-35W including entrance from Pharr St. to SB I-35W

7/30 9a - 7/30 3p: Left lane closure on EB frontage road SH-183 between Westpark Way and Industrial Blvd.

7/28 10p - 7/29 1a: 2 right lane closure on EB frontage road I-820 between Haltom Rd. and Denton Hwy.

7/28 9a - 7/28 3p: Left lane closure on EB frontage road SH-183 between Westpark Way and Industrial Blvd.

7/23 9p - 7/24 5a: 2 left lane closure on WB SH-183 between Westpark Way and Central Dr.

7/23 9a - 7/25 5p: Rolling closures on EB frontage road and WB frontage road located at I-820 between I-35W and SH-26; SH-183 between Bedford-Euless Rd and Industrial Blvd. Each closure will be performed for 15 minutes, blocking 1 lane on frontage roads and not affecting any ramps or intersections. 

7/21 9p - 7/22 5a: Left lane closure on NB I-35W between I-820 and Fossil Creek Blvd.

7/15 9p - 7/16 5a: Left lane closure on EB I-820 between Holiday Ln. and SH26

7/15 9p - 7/16 5a: Left lane closure on EB I-820 between 

7/14 9p - 7/15 5a: 2 right lane closure on WB SH-183 including entrance from WB frontage road to WB SH-183 past Central Dr.

7/12 9p - 7/13 5a: 2 left lane closure on WB SH-183 between Bedford Rd. and Browntrail

 

NTE and NTE 35W TEXpress Lanes

9/1 9p - 9/2 5a: Full closure of EB frontage road I-820 including EB Haltom Bypass and Exit from EB NTE TEXpress Lanes

8/30 9p - 8/31 5a: Full closure of WB Haltom Bypass including entrance to WB NTE TEXpress Lanes past Haltom Rd.

8/29 11p - 8/30 7a: Full closure of EB frontage road including entrance ramp from EB frontage road to EB NTE TEXpress Lanes past Denton Hwy.

8/28 9p - 8/29 10a: Full closure of WB frontage road I-820 including:

  • Full closure of exit from WB I-820 to WB frontage road past Denton Hwy
  • Full closure of WB Haltom Bypass including entrance to WB NTE TEXpress Lanes

8/27 9p - 8/28 5a: Full closure of WB Haltom Bypass including the entrance to WEB NTE TEXpress Lanes past Haltom Rd.

8/26 9p - 8/27 5a: 2 left lane closure on EB frontage road I-820 including:

  • Entrance from EB frontage road to EB Haltom Bypass
  • Exit from EB NTE TEXpress Lanes to Haltom EB Bypass

8/22 9p - 8/23 5a: Full closure of EB frontage road including entrance ramp from EB frontage road to EB NTE TEXpress Lanes past Denton Hwy.

8/21 10:30a - 12p: Full closure of EB NTE TEXpress Lanes at Industrial Blvd (

8/20 9p - 8/21 5a: Full closure of WB NTE TEXpress Lanes involving the following ramps located at SH-121/SH-183 between Industrial Blvd. and Forest Ridge Dr.:

  • Full closure of entrance ramp from SB SH-121 general highway lanes to WB NTE TEXpress Lanes
  • Full closure of entrance ramp from WB frontage road to WB NTE TEXpress Lanes past Industrial Blvd.
  • Full closure of entrance ramp from WB general highway lanes to WB NTE TEXpress Lanes past Industrial Blvd.
  • Full closure of entrance from Midtown WB NTE TEXpress Lanes at N. Main St.

8/13 9p - 8/14 5a: Full closure of entrance from NP I-820 to EB NTE TEXpress Lanes at W Pipeline Rd.

8/11 9p - 8/12 5a: Full closure of entrance from NB US 287 to NB I-35W including the entrance from NB I-35W to NB NTE 35W TEXpress Lanes

7/28 11p - 7/29 1a: Full closure of EB Halton Bypass including exit from EB NTE 35W TEXpress Lanes to EB frontage road past Beach St. (located on I-820 between Beach St. and Haltom Rd.)

7/15 9p - 7/16 5a: 2 left lane closure on E Weatherford St. including entrance ramp from E Weatherford St. to NB NTE 35W TEXpress Lanes

 

--

*All closures are subject to change due to weather conditions